Contractors, please read and understand these rules:
Speed limit is 20 miles per hour. Weight limit restrictions coincide with Ogle County Highway road postings. Any construction sign must be removed from property when the final inspection has been completed. Construction hours are Monday thru Friday 7 a.m. to 7 p.m., Saturday and Sunday 8 a.m. to 5 p.m. Drainage ditches are not to be driven through. Do not place excavated dirt, materials, tree stumps or brush onto adjacent property. Mud tracked on the street must be removed daily. Any changes to plans must be approved by ACC/ECC. Concrete washout is not to be placed on any street or ditch. Ditches and swales must be restored to their original condition. No temporary structures or trailers may be used for the purpose of storage or residence. However, a contractor may use a temporary structure to store tools and material used during the construction process. Late permit request and re-inspection fees or fines, where applicable* The contractors, subcontractors or their families are allowed to use the amenities of the community provided they either: (1) are a ULLPOA property owner, or (2) have a valid guest pass issued by the ULLPOA. Property owner must check with the Lost Lake Utility District (www.lostlakeutilitydistrict.org) for water lines intruding on the property that may interfere with construction of any type. Property owner must check with appropriate provider for electric, phone and cable that may interfere with construction. Dumpsters should be located such that they do not impede or hinder street traffic. The ACC/ECC must be notified of any changes to construction plans, or changes in contractors.