Section
Lot Number(s)
Property Owner’s Name
Property Address
Home Phone
Cell Phone
Email
Setbacks Front (27’ minimum)
Back (30’ minimum)
(*) Right
(*) Left
Please read and understand this checklist:
Submit one set blueprints or CAD drawing with plot plan, elevation, and setbacks with an Illinois Architectural Stamp. Submit a copy of the Ogle County permit. Design must be architecturally compatible with the house. If the addition is any room adding more drains, such as an additional bedroom and/or bathroom, septic systems must be upgraded in accordance with Illinois Department of Health, and Ogle County Department of Health. The State of Illinois Department of Public Health, and Ogle County Health Department must approve any other changes to drainage sewage treatment systems. Exterior of the addition must be completed within 9 months of excavation. Extensions may be granted on a case-by- case basis due to unforeseeable conditions. A silt fence is required on any property adjacent to Lost Lake. Fee for a Home Addition Permit is $1,460.00 ($460.00 is non-refundable and $1,000.00 is refundable upon successful completion of the ACC/ECC final inspection. This is to cover the cost of inspections, in the event that there are missed inspections, re-inspections or fines the additional costs will be taken out of the refundable portion. The homeowner is liable for any misconduct or damage exceeding $1,460.00. Refundable portion will be refunded after a successful final ACC/ECC inspection.
Submit one set of blueprints or CAD drawing including site plan with elevation to scale for ACC/ECC review.
Submit a copy of the Ogle County permit.
Construction Rules & Regulations
Contractors, please read and understand these rules:
Speed limit is 20 miles per hour. Weight limit restrictions coincide with Ogle County Highway road postings. Any construction sign must be removed from property when the final inspection has been completed. Construction hours are Monday thru Friday 7 a.m. to 7 p.m., Saturday and Sunday 8 a.m. to 5 p.m. Drainage ditches are not to be driven through. Do not place excavated dirt, materials, tree stumps or brush onto adjacent property. Mud tracked on the street must be removed daily. Any changes to plans must be approved by ACC/ECC. Concrete washout is not to be placed on any street or ditch. Ditches and swales must be restored to their original condition. No temporary structures or trailers may be used for the purpose of storage or residence. However, a contractor may use a temporary structure to store tools and material used during the construction process. Late permit request and re-inspection fees or fines, where applicable* The contractors, subcontractors or their families are allowed to use the amenities of the community provided they either: (1) are a ULLPOA property owner, or (2) have a valid guest pass issued by the ULLPOA. Property owner must check with the Lost Lake Utility District (www.lostlakeutilitydistrict.org) for water lines intruding on the property that may interfere with construction of any type. Property owner must check with appropriate provider for electric, phone and cable that may interfere with construction. Dumpsters should be located such that they do not impede or hinder street traffic. The ACC/ECC must be notified of any changes to construction plans, or changes in contractors.
* Fines:
Contractor’s Name
Contractor's Office Email
Contractor's Office Phone
Contractor's Cell Phone
Contractor's Address
Plumbing Contractor’s Name
Plumbing Contractor's License
Plumbing Contractor's Email
Plumbing Contractor's Cell Phone
Plumbing Contractor's Address
Roofing Contractor’s Name
Roofing Contractor's License
Roofing Contractor's Email
Roofing Contractor's Cell Phone
Roofing Contractor's Address
Excavation Contractor's Name
Excavation Contractor's Email
Excavation Contractor's Phone
Excavation Contractor's Cell Phone
Excavation Contractor's Address
Foundation Contractor's Name
Foundation Contractor's Email
Foundation Contractor's Phone
Foundation Contractor's Cell Phone
Foundation Contractor's Address
Framing Contractor's Name
Framing Contractor's Email
Framing Contractor's Phone
Framing Contractor's Cell Phone
Electrical Contractor's Name
Electrical Contractor's Email
Electrical Contractor's Phone
Electrical Contractor's Cell Phone
Electrical Contractor's Address
Mechanical Contractor's Name
Mechanical Contractor's Email
Mechanical Contractor's Phone
Mechanical Contractor's Cell Phone
Mechanical Contractor's Address
Inspection Requirements
1. Casper’s Home Inspection, LLC
2. Illinois Department of Public Health
3. ACC/ECC (ULLPOA) FINAL
Date
Send